Environmental compliance

Continuous sonde streams, ECC condition matrix, auto-drafted EMB-DENR reports.

Outfalls monitored
Loading Outfalls monitored
Parameters streaming
Loading Parameters streaming
Time saved (YTD)
Loading Time saved (YTD)
ECC exceedances
Loading ECC exceedances
Temperature
ECC range 2532 °C
28.1°C
Healthy
Temperature trend over time with regulatory minimum and maximum reference lines is loading
Dissolved O₂
ECC range 512 mg/L
5.1mg/L
Watch
Dissolved O₂ trend over time with regulatory minimum and maximum reference lines is loading
pH
ECC range 6.58.5
7.43
Healthy
pH trend over time with regulatory minimum and maximum reference lines is loading
Turbidity
ECC range 050 NTU
20.2NTU
Healthy
Turbidity trend over time with regulatory minimum and maximum reference lines is loading
ECC compliance matrix
Live state at each monitored discharge point. Anomaly detection raises alerts before EMB sampling intervals would catch them.
OutfallTemperatureDissolved O₂pHTurbidityLast sync
Magat tailrace
28.1
Healthy
5.1
Watch
7.43
Healthy
20.2
Healthy
12s ago
Ambuklao outfall
28.0
Healthy
4.5
Critical
7.49
Healthy
21.8
Healthy
18s ago
Binga outfall
27.8
Healthy
4.8
Critical
7.53
Healthy
22.3
Healthy
9s ago
ECC condition register
All 12 conditions from the Environmental Compliance Certificate · audit trail
12 conditions · 0 breaches
ConditionCategoryRequiredCurrentStatusLast audit
Minimum environmental flow
C1
Water
≥ 45 m³/s52.4 m³/s
Healthy
2026-05-12
Tailrace dissolved oxygen
C2
Water
≥ 5.0 mg/L5.62 mg/L
Healthy
2026-05-30
Magat outfall DO (sonde 2)
C3
Water
≥ 5.0 mg/L5.20 mg/L
Watch
2026-05-30
Reservoir operating range
C4
Water
160–193 m EL193.2 m EL
Watch
2026-05-29
Turbidity (Magat tailrace)
C5
Water
≤ 50 NTU21 NTU
Healthy
2026-05-30
Genset stack opacity (Maris)
C6
Air
≤ 20%8%
Healthy
2026-04-22
Reforestation hectarage
C7
Land
≥ 1,200 ha cum.1,418 ha
Healthy
2026-03-15
Quarterly EMB report submission
C8
Reporting
by Q+45 daysQ2 draft d-11
Healthy
2026-05-31
Self-monitoring report (SMR)
C9
Reporting
monthlyApr submitted
Healthy
2026-05-15
IEC / community consultation
C10
Community
≥ 2 / year2 (May, Feb)
Healthy
2026-05-18
Watershed canopy cover
C11
Land
≥ 60%63.8%
Healthy
2026-02-28
Resettlement assistance audit
C12
Community
annual2025 closed
Watch
2025-11-10